Use this before hot works
- Decide if a hot-work permit is required by the site, task, material, location or client rules.
- Record pre-work checks, fire watch duration, extinguishers, isolation and post-work monitoring.
- Feed the permit controls into the RAMS sequence rather than leaving them as a separate form.