Find or build a site-specific RAMS.
Start from the closest template or build from scratch. Add your site details, answer the risk questions and download a clean draft PDF.
Plumbing & Heating · hot works
Boiler installation — Method Statement & Risk Assessment
Starting draft based on the selected report
Risk 1-25 · likelihood x severity · controls applied for residual
Is gas work involved?
Is hot work involved (soldering, brazing or cutting)?
Is the property occupied during the work?
- Hazards and controls loaded
- Method sequence drafted
- Site address completed
- Principal contractor / client completed
- Your company (contractor) completed
- Job questions answered (0/6)
- No high residual risks in scope
Opens the full builder with this report selected. You review and approve as the competent person.
Build this draft →- Site-specific prompts
- Competent-person review built in
- CDM/HSE-grounded structure
- Free during early access
Built for subcontractors and trades
For teams who need a RAMS that can be briefed on site, checked by a client and reviewed by the person responsible for the work.
Every page points back to the same RAMS standard
Templates, tools and builder reports are structured around the checks that make a RAMS specific, evidence-ready and usable by a site supervisor.
Site-specific
Actual site, work area, access, interfaces, site rules, public or occupants and emergency arrangements.
Evidence-ready
Permits, COSHH/SDS, competence, inspections, isolation records, briefings, sign-off and revision control.
Usable on site
A numbered method, risk ratings and controls a supervisor can brief before work starts.
Competent review
RamsDocs drafts the document; the competent person checks, revises and approves it before use.
Built around CDM 2015, HSE construction guidance and RamsDocs reviewed task knowledge. No guarantee of acceptance: each RAMS still needs competent review against the live site.
Draft fast. Review properly. Submit with evidence.
No blank Word file and no mystery output. See the draft, refine the site-specific details, check the gaps, then export when it is ready for review.
Choose your trade
Pick the work your team is doing. RamsDocs loads a trade-specific RAMS starting point with hazards, controls, PPE and method steps.
Configure it live
Confirm what applies to this job: working at height, hot works, occupied site, dust, chemicals, lifting, electrical isolation, access and interfaces.
Get it review-ready
RamsDocs flags missing safety-critical details and evidence prompts before you review, approve and download for principal-contractor review.
See the document first, then tighten the details
RamsDocs starts with a visible RAMS draft and asks for the details that change the controls: site constraints, access, permits, supervision, emergency arrangements and interfaces with others.
A specialist RAMS knowledge library, not a generic AI prompt
Drafts start from structured trade hazards, controls, PPE, plant, competence and method steps.
- 177 task templates across 11 categories
- Specific controls, not vague PPE-only statements
- Built around CDM 2015 and relevant HSE guidance
RAMS
MEWP / Cherry Picker RAMS
RAMS
Electrical Installation RAMS
RAMS
Excavation RAMS
RAMS
Welding Hot Works RAMS
RAMS
Silica Dust (RCS) RAMS
RAMS
Soft Strip-out RAMS






See what’s missing before your client does
As you configure the job, RamsDocs flags safety-critical gaps that commonly trigger reviewer comments, so the competent person can resolve them before submission.
- Work at height selected but access method missing
- Hot works selected but permit / fire-watch not confirmed
- COSHH trigger detected but substance controls missing
- Occupied premises selected but public segregation not included
- Site supervisor / competent person missing
- Emergency / rescue arrangements need confirmation
- Briefing, sign-off or review date missing
Statuses: Draft → Needs confirmation → Ready for review
A clean RAMS your principal contractor can review quickly
Export a structured RAMS with the sections reviewers and supervisors expect.
- Scope, site details & method sequence
- Hazards, controls & 5×5 risk ratings
- PPE, competence & emergency arrangements
- Briefing & sign-off sheet
- Clean, branded PDF / DOCX — reopen & re-export anytime
Method Statement & Risk Assessment
Scaffold Erection & Dismantling
Site: Unit 4, Brookfield Ind. Est. · CDM 2015

One vague section can turn a RAMS into a rework loop.
Legal exposure
Scales with turnover
Health and safety sentencing guidelines assess organisational fines by culpability, harm and company turnover.
Site access
No sign-off, no start
On principal-contractor-led sites, a returned RAMS can mean rework before the team can get on with the job.
Review risk
New site, new details
Reviewers spot copy-paste gaps: old client names, missing access details, vague controls and generic emergency plans.
RAMS shaped around your trade
Start from the tasks your trade actually does on site. Popular with plumbing, heating, electrical and scaffolding contractors.

Plumbing & Heating
Boiler installation · Pipework & soldering · Plant room works · Bathroom installation
View Plumbing & Heating RAMS →
Electrical
Isolation & lock-off · Testing & inspection · Containment · Working at height
View Electrical RAMS →
Scaffolding
Erection sequence · Loading bay · TG20 compliance · Edge protection
View Scaffolding RAMS →
Groundworks
Excavation · Services / CAT scanning · Shoring · Plant & exclusion zones
View Groundworks RAMS →
Roofing
Working at height · Fragile surfaces · Edge protection · MEWP use
View Roofing RAMS →
Fencing
Post setting & concreting · Buried services / CAT scan · Palisade & security fencing · Roadside / highway fencing
View Fencing RAMS →
HVAC & Air Conditioning
Split-system installation · Refrigerant pipework & brazing · F-gas charging & recovery · Rooftop plant lifting
View HVAC & Air Conditioning RAMS →
Cleaning
Builders / sparkle clean · Commercial cleaning · External window cleaning · Jet washing
View Cleaning RAMS →
Landscaping & Tree Surgery
Tree surgery & pruning · Tree felling · Wood chipper & stump grinding · Soft & hard landscaping
View Landscaping & Tree Surgery RAMS →
Rope Access
Work positioning (IRATA) · Building inspection · Facade cleaning
View Rope Access RAMS →
Steel Erection
Structural steel erection · Safety netting · Metal decking
View Steel Erection RAMS →
Paving & Surfacing
Block paving & flags · Tarmac & asphalt · Kerbing & edgings
View Paving & Surfacing RAMS →
Security Systems
Intruder alarm · Access control · Roller shutters & barriers
View Security Systems RAMS →
Fire Doors
Fire door installation · Fire door inspection · Fire damper install & inspection
View Fire Doors RAMS →
Asbestos
Asbestos risk assessment · Non-licensed removal · Sampling · Encapsulation & disposal
View Asbestos RAMS →
Rescue Plans
Confined space rescue · MEWP rescue · Work at height rescue
View Rescue Plans RAMS →
Events
Event risk assessment · Temporary structures · Crowd & emergency planning
View Events RAMS →
Warehousing
Warehouse risk assessment · Forklift operations · Racking & manual handling
View Warehousing RAMS →
Facilities Management
FM & reactive maintenance · Working in occupied premises · Permit-controlled work
View Facilities Management RAMS →177 RAMS templates behind the draft
Across 11 categories of UK construction work.
Work at Height
Scaffolds, towers, MEWPs, ladders, roof work.
Electrical
Installation, live working, temporary site supplies.
Groundworks & Excavation
Excavation, trenching, confined spaces, drainage.
Lifting & Plant
Cranes, telehandlers, excavators, site transport.
Hot Works
Welding, cutting, grinding, brazing.
COSHH & Substances
Dust, cement, solvents, lead, hazardous substances.
Demolition & Strip-out
Soft strip, demolition, asbestos awareness.
Trades & Finishing
Brickwork, joinery, plastering, painting, flooring.
Building Services & M&E
HVAC, gas, plumbing, fire systems, solar PV, security & data.
Fit-out & Interiors
Ceilings, drylining, glazing, screeding, floor coverings.
Site & General
Welfare setup, traffic, manual handling, lone working.
Popular templates
Scaffold Erection & Dismantling RAMS
Scaffolding · Scaffold erection
Electrical Installation RAMS
Electrical · Electrical installation
Excavation RAMS
Groundworks · Excavation
Welding Hot Works RAMS
Mechanical · Welding
Silica Dust (RCS) RAMS
General · Silica dust
Site Setup & Welfare RAMS
Site · Site setup & welfare
Free health & safety tools
49 calculators, checkers and document builders for the paperwork that comes with site work — free, no signup.
Run your RAMS against the checks principal contractors commonly make before review and sign-off.
Upload a plan or photo and mark up routes, exclusion zones, services and permit areas for a RAMS-ready briefing sketch.
Add each vibrating tool and trigger time to get daily exposure points and A(8), checked against the HSE action and limit values.
Score likelihood × severity on the standard 5×5 matrix, get the risk rating and what it means for your RAMS.
Answer a few questions about the project and see your CDM 2015 duties — and whether it's F10 notifiable.
Build a short, structured toolbox talk with an attendance and sign-off sheet.