RamsDocs
RAMS for UK trades, tailored to the job

Find or build a site-specific RAMS.

Start from the closest template or build from scratch. Add your site details, answer the risk questions and download a clean draft PDF.

See what the finished RAMS looks like — sample PDF

1Choose a category
2Choose your report

Plumbing & Heating · hot works

Boiler installation — Method Statement & Risk Assessment

Starting draft based on the selected report

Draft - early
Readiness38% ready
HazardInitialResidual
Electric shock from live conductors or isolation failure205
Gas escape — uncontrolled release205
Fall from height during installation or work at height205
Asbestos disturbance or contact205
Manual handling — heavy or bulky items124

Risk 1-25 · likelihood x severity · controls applied for residual

3Site details
4Job questions

Is gas work involved?

Is hot work involved (soldering, brazing or cutting)?

Is the property occupied during the work?

5Pre-submission checks
  • Hazards and controls loaded
  • Method sequence drafted
  • Site address completed
  • Principal contractor / client completed
  • Your company (contractor) completed
  • Job questions answered (0/6)
  • No high residual risks in scope

Opens the full builder with this report selected. You review and approve as the competent person.

Build this draft →
Built aroundCDM 2015Work at Height Regs 2005LOLER 1998COSHH 2002HSE guidance
For UK site work

Built for subcontractors and trades

For teams who need a RAMS that can be briefed on site, checked by a client and reviewed by the person responsible for the work.

Reviewer standard

Every page points back to the same RAMS standard

Templates, tools and builder reports are structured around the checks that make a RAMS specific, evidence-ready and usable by a site supervisor.

Site-specific

Actual site, work area, access, interfaces, site rules, public or occupants and emergency arrangements.

Evidence-ready

Permits, COSHH/SDS, competence, inspections, isolation records, briefings, sign-off and revision control.

Usable on site

A numbered method, risk ratings and controls a supervisor can brief before work starts.

Competent review

RamsDocs drafts the document; the competent person checks, revises and approves it before use.

Built around CDM 2015, HSE construction guidance and RamsDocs reviewed task knowledge. No guarantee of acceptance: each RAMS still needs competent review against the live site.

How it works

Draft fast. Review properly. Submit with evidence.

No blank Word file and no mystery output. See the draft, refine the site-specific details, check the gaps, then export when it is ready for review.

Step 1

Choose your trade

Pick the work your team is doing. RamsDocs loads a trade-specific RAMS starting point with hazards, controls, PPE and method steps.

Step 2

Configure it live

Confirm what applies to this job: working at height, hot works, occupied site, dust, chemicals, lifting, electrical isolation, access and interfaces.

Step 3

Get it review-ready

RamsDocs flags missing safety-critical details and evidence prompts before you review, approve and download for principal-contractor review.

No long questionnaire

See the document first, then tighten the details

RamsDocs starts with a visible RAMS draft and asks for the details that change the controls: site constraints, access, permits, supervision, emergency arrangements and interfaces with others.

The old wayRamsDocs
Start with a blank Word doc Start with a trade-specific RAMS draft
Answer every question upfront Configure the visible document live
Copy-paste last job Built from a specialist RAMS library
Spot missing details after rejection Pre-submission checker flags gaps
The engine

A specialist RAMS knowledge library, not a generic AI prompt

Drafts start from structured trade hazards, controls, PPE, plant, competence and method steps.

  • 177 task templates across 11 categories
  • Specific controls, not vague PPE-only statements
  • Built around CDM 2015 and relevant HSE guidance
Browse the RAMS template library
ramsdocs.co.uk/templates
Search 177 RAMS templates…

RAMS

MEWP / Cherry Picker RAMS

RAMS

Electrical Installation RAMS

RAMS

Excavation RAMS

RAMS

Welding Hot Works RAMS

RAMS

Silica Dust (RCS) RAMS

RAMS

Soft Strip-out RAMS

UK trades and construction site work
UK trades and construction site work
UK trades and construction site work
UK trades and construction site work
UK trades and construction site work
UK trades and construction site work
Pre-submission checker

See what’s missing before your client does

As you configure the job, RamsDocs flags safety-critical gaps that commonly trigger reviewer comments, so the competent person can resolve them before submission.

  • Work at height selected but access method missing
  • Hot works selected but permit / fire-watch not confirmed
  • COSHH trigger detected but substance controls missing
  • Occupied premises selected but public segregation not included
  • Site supervisor / competent person missing
  • Emergency / rescue arrangements need confirmation
  • Briefing, sign-off or review date missing

Statuses: DraftNeeds confirmationReady for review

The output is the product

A clean RAMS your principal contractor can review quickly

Export a structured RAMS with the sections reviewers and supervisors expect.

  • Scope, site details & method sequence
  • Hazards, controls & 5×5 risk ratings
  • PPE, competence & emergency arrangements
  • Briefing & sign-off sheet
  • Clean, branded PDF / DOCX — reopen & re-export anytime
RamsDocs
Ready for review

Method Statement & Risk Assessment

Scaffold Erection & Dismantling

Site: Unit 4, Brookfield Ind. Est. · CDM 2015

HazardInitialResidual
Fall from the leading edge before guardrails are fitted2010
Manual handling of scaffold tubes, boards and fittings at height126
Scaffold collapse from missing ties, bracing or overloading155
Following trades using an incomplete or untagged scaffold124
Risk 1–25 · likelihood × severityExport PDF
Construction site team reviewing RAMS paperwork
Why the detail matters

One vague section can turn a RAMS into a rework loop.

Legal exposure

Scales with turnover

Health and safety sentencing guidelines assess organisational fines by culpability, harm and company turnover.

Site access

No sign-off, no start

On principal-contractor-led sites, a returned RAMS can mean rework before the team can get on with the job.

Review risk

New site, new details

Reviewers spot copy-paste gaps: old client names, missing access details, vague controls and generic emergency plans.

By trade

RAMS shaped around your trade

Start from the tasks your trade actually does on site. Popular with plumbing, heating, electrical and scaffolding contractors.

Plumbing & Heating work on a UK construction site

Plumbing & Heating

Boiler installation · Pipework & soldering · Plant room works · Bathroom installation

View Plumbing & Heating RAMS →
Electrical work on a UK construction site

Electrical

Isolation & lock-off · Testing & inspection · Containment · Working at height

View Electrical RAMS →
Scaffolding work on a UK construction site

Scaffolding

Erection sequence · Loading bay · TG20 compliance · Edge protection

View Scaffolding RAMS →
Groundworks work on a UK construction site

Groundworks

Excavation · Services / CAT scanning · Shoring · Plant & exclusion zones

View Groundworks RAMS →
Roofing work on a UK construction site

Roofing

Working at height · Fragile surfaces · Edge protection · MEWP use

View Roofing RAMS →
Fencing work on a UK construction site

Fencing

Post setting & concreting · Buried services / CAT scan · Palisade & security fencing · Roadside / highway fencing

View Fencing RAMS →
HVAC & Air Conditioning work on a UK construction site

HVAC & Air Conditioning

Split-system installation · Refrigerant pipework & brazing · F-gas charging & recovery · Rooftop plant lifting

View HVAC & Air Conditioning RAMS →
Cleaning work on a UK construction site

Cleaning

Builders / sparkle clean · Commercial cleaning · External window cleaning · Jet washing

View Cleaning RAMS →
Landscaping & Tree Surgery work on a UK construction site

Landscaping & Tree Surgery

Tree surgery & pruning · Tree felling · Wood chipper & stump grinding · Soft & hard landscaping

View Landscaping & Tree Surgery RAMS →
Rope Access work on a UK construction site

Rope Access

Work positioning (IRATA) · Building inspection · Facade cleaning

View Rope Access RAMS →
Steel Erection work on a UK construction site

Steel Erection

Structural steel erection · Safety netting · Metal decking

View Steel Erection RAMS →
Paving & Surfacing work on a UK construction site

Paving & Surfacing

Block paving & flags · Tarmac & asphalt · Kerbing & edgings

View Paving & Surfacing RAMS →
Security Systems work on a UK construction site

Security Systems

Intruder alarm · Access control · Roller shutters & barriers

View Security Systems RAMS →
Fire Doors work on a UK construction site

Fire Doors

Fire door installation · Fire door inspection · Fire damper install & inspection

View Fire Doors RAMS →
Asbestos work on a UK construction site

Asbestos

Asbestos risk assessment · Non-licensed removal · Sampling · Encapsulation & disposal

View Asbestos RAMS →
Rescue Plans work on a UK construction site

Rescue Plans

Confined space rescue · MEWP rescue · Work at height rescue

View Rescue Plans RAMS →
Events work on a UK construction site

Events

Event risk assessment · Temporary structures · Crowd & emergency planning

View Events RAMS →
Warehousing work on a UK construction site

Warehousing

Warehouse risk assessment · Forklift operations · Racking & manual handling

View Warehousing RAMS →
Facilities Management work on a UK construction site

Facilities Management

FM & reactive maintenance · Working in occupied premises · Permit-controlled work

View Facilities Management RAMS →
The library

177 RAMS templates behind the draft

Across 11 categories of UK construction work.

Browse all templates

Popular templates