1. Paperwork & briefing

The job is covered, understood and authorised before anyone lifts a tool.

RAMS read and briefed to everyone doing the task?
RAMS read and briefed to everyone doing the task?
Permits in place where the work needs them (hot works, dig, confined space, isolation)?
Permits in place where the work needs them (hot works, dig, confined space, isolation)?
Site induction done for everyone on the team?
Site induction done for everyone on the team?

2. The work area now

What you can actually see in front of you, not what the plan assumed.

Access and egress clear and safe (including the emergency route)?
Access and egress clear and safe (including the emergency route)?
Lighting adequate for the task?
Lighting adequate for the task?
Housekeeping acceptable — no trip, slip or fire-load build-up?
Housekeeping acceptable — no trip, slip or fire-load build-up?
Public and other trades segregated from your work zone?
Public and other trades segregated from your work zone?
Weather suitable for the task (wind, rain, ice, heat)?
Weather suitable for the task (wind, rain, ice, heat)?

3. Services & hidden dangers

The things that injure people when they are assumed rather than checked.

Buried and overhead services located and marked (drawings, CAT scan, spotting)?stop check
Buried and overhead services located and marked (drawings, CAT scan, spotting)?
Isolations confirmed by prove dead — live, dead, live?stop check
Isolations confirmed by prove dead — live, dead, live?
Asbestos register checked for any pre-2000 building before disturbing fabric?stop check
Asbestos register checked for any pre-2000 building before disturbing fabric?

4. Plant, tools & kit

Right kit, in date, in good order, ready before the task starts.

Right tools available and inspected (no damage, in test date)?
Right tools available and inspected (no damage, in test date)?
Guards and safety devices in place and working?
Guards and safety devices in place and working?
Lifting kit (slings, chains, eyes) in date and undamaged?
Lifting kit (slings, chains, eyes) in date and undamaged?
PPE on hand, serviceable and the right type for the task?
PPE on hand, serviceable and the right type for the task?

5. People

The team is competent, fit and properly looked after for this task.

Everyone competent and authorised for THIS task?
Everyone competent and authorised for THIS task?
Everyone fit for work — no fatigue, illness, drink, drugs or medication concerns?
Everyone fit for work — no fatigue, illness, drink, drugs or medication concerns?
New starters paired up and supervised?
New starters paired up and supervised?
Lone-working plan in place and check-in agreed, if anyone works alone?
Lone-working plan in place and check-in agreed, if anyone works alone?

6. Changes from the RAMS

The whole point of a POWRA — what is different today from the planned task.

Has ANYTHING changed from what the RAMS describes — scope, conditions or method?stop check
Has ANYTHING changed from what the RAMS describes — scope, conditions or method?
Any new hazards introduced by others working nearby?stop check
Any new hazards introduced by others working nearby?
Answer every check above (0 of 21 done) to get the stop / go decision and a printable, signable card.