Free early access: RAMS builder, templates and tools are open now.Build a RAMS draft →
RamsDocs
Every lifting operation must be planned by a competent person (LOLER 1998 reg 8). This builder produces a basic lift plan for routine, low-risk lifts. The finished plan must be reviewed and authorised by the named appointed person before the lift — this tool does not act as the appointed person and does not authorise anything.

Lift details

Lift classification

BS 7121 classifies lifts as basic, intermediate or complex. This tool covers basic lifts only.

Roles

On a basic lift one competent person may hold more than one role — but each role must still be a named, competent, suitably ticketed individual.

Names, site names and plant & tools you type are remembered on this device for next time — nothing is sent to us.

Load

Equipment

LOLER thorough examination in date

LOLER 1998 reg 9(3): at least every 6 months for lifting accessories (and equipment that lifts people), at least every 12 months for other lifting equipment, or in accordance with a written examination scheme drawn up by a competent person.

Environment

Exclusion zone

Communication

Lift sequence

Document control

Who owns this document and when it gets looked at again — the evidence reviewers check first.

Name, role and company are remembered on this device only — nothing is sent to us.

Appears on every printed document — saved on this device only, never uploaded.
Was this tool helpful?

Found something wrong, out of date, or missing?