Use this as a drafting pattern
- Convert generic controls into named locations, named equipment and named responsibilities.
- Show how the control appears in both the risk assessment and method statement.
- Use the same before/after structure to improve rejected RAMS.
Sources Used
These tools are drafting aids. Check the current source material before relying on them for a live project.
- Managing risks and risk assessment at work (HSE)
- Construction (Design and Management) Regulations 2015 (legislation.gov.uk)